REFINERY PLANNING.
GulfStar Refining — Maintenance Planning · fictional facility
Guided demonstration · 3 minutes · no login
Refinery Planning Command Center
Turn incomplete work requests into planner-ready work packages—without losing human approval.
Demonstration uses fictional data. Dream.OS supports planning and coordination; it does not control equipment, issue permits, or replace safety authorization.
Morning workload · 06:00
GulfStar Refining — Maintenance Planning Day shift 06:00–18:00 Planning horizon 7 days
| Work request | Condition | Current blocker |
|---|---|---|
| P-310 seal replacementCrude Unit 1 · rotating equipment | Priority | Seal kit not confirmed |
| E-402 exchanger cleaningCrude Unit 2 · static equipment | Planned outage | Contractor availability missing |
| HX-204 inspectionCrude Unit 2 · shell-and-tube | Ready for review | Planner approval required |
| V-115 valve inspectionCrude Unit 1 · block valve | Incomplete | Isolation document missing |
| UT inspection routeCrude Unit 1 & 2 · thickness route | Scheduled | Ready |
Readiness checks
Sorted work queue
Planning closeout
What this did not do. Dream.OS recorded whether required information was present and routed the package to you. It did not authorize isolation, issue a permit, validate a document, or change equipment state. Those stay with the people and systems that hold them today.
Show Us Your Planning Workflow
Send one sanitized spreadsheet, report, or work-request template. We'll configure a private workflow demonstration around your process — your conditions, your blocker categories, your approval step.
- Strip names, tags, and anything site-identifying first. A blank template works.
- We come back with your workflow running, not a slide deck.
- If it does not resemble your day, that is a useful answer too.